Huade Machinery

Professional plastic pipe extrusion machinery manufacturer

You are here:

PVC Pipe Extrusion Line

Introduction

The raw material purchase PC pellets made by LOTE, BAYER, SABIC and other relative raw material supplier.

Pipe size range: T5, T8, T10, T12 single and two color LED light tubes and different kinds of new designed LED light tubes.

Advantage Introduction

Polyvinyl chloride (PVC) pipe is made from a thermoplastic that contains mainly PVC resin with the addition of compounds such as stabilisers, lubricants, plasticisers, pigments and other products that aid in the manufacturing process.

Application

The pipes are durable, hard to damage, and long lasting. They do not rust, rot, or wear over time. For that reason, PVC piping is most commonly used in water systems, underground wiring, and sewer lines.

Date Information

Main ExtruderS]Z80/156 or SJZ80/173
Pipe Diameter110, 140, 160, 200, 225, 250, 280, 315
Die Head110-200225-315
Down-stream EquipmentBelling MachineLaser PrinterHigh Speed MixerCrusherMill
Total Power190kw or 215kw

Feature

Exellent Stability

Perfect Synchronized

Minimum Material Consumption

Exellent Stability

Perfect Synchronized

Minimum Material Consumption

Application

PVC Pipe

Read More

PVC Pipe

Read More

PVC Pipe

Read More

PVC Pipe

Read More

Customer Case

Introduction to the delivery process

The Vietnam customer choose 3 suppliers for comparison before last decision, he came and check our machinery before he placed the order.

He already have 3 plastic pipe extrusion line in factory,2 PPR pipe (20-63mm ) and 1 HDPE pipe (75-250mm ),he want to set up 2 PVC pipe production lines? this time after he get the market research from local, one line for electrical conduit use diameter range 16-40mm ,the other line for water convey as drainage use diameter range 50-160mm,we recommend him our 2 strand extrusion line for small diameter and single extrusion line for big diameter, he was pleased? with our recommendation and signed the sales contract on 10th? March, we get the down pay on 15th March after he return back.

He came and visit factory again on 18th April, his purpose of this trip is to see the machines running before shipment, our engineer arrange everything before his coming such as wiring connect, water and compressed air supply, after 2 hours preheating, the pipe came out successfully at one time, he was very satisfied with our machine quality and quality of finished pipe, we loaded all machines into 2X40GP container on 25th April, our customer indicate us he will purchase another PVC pipe production line next year.